Project Scheduler
📣 إعلان| نوع العقد | دوام كامل | |
| طبيعة الوظيفة | بالموقع | |
| الموقع | الجبيل |
وصف الوظيفة
About the Role
ArcelorMittal Tubular Products Al-Jubail is seeking a Project Scheduler to join their team in Al Jubail, Eastern region. This full-time role is central to the development, monitoring, and control of integrated project schedules for the Engineering, Procurement, and Construction (EPC) of a heat treatment and finishing facility. The Project Scheduler will ensure project milestones are met on time and within budget, aligning with company objectives and regulatory compliance.
Key Responsibilities
- Develop and maintain a detailed, logically linked Level 3/4 project schedule for the EPC project.
- Coordinate with engineering, procurement, and construction teams to gather input and update progress.
- Monitor critical paths, identify schedule deviations, and propose recovery plans to maintain project timelines.
- Generate weekly and monthly progress reports, including S-curves, histograms, look-ahead schedules, and KPI dashboards.
- Support the project team in managing interfaces between disciplines and contractors to prevent delays.
- Analyze the schedule impact of design changes, construction delays, material deliveries, and vendor lead times.
- Maintain baseline schedules and perform earned value management (EVM) analysis.
- Participate in project meetings, management presentations, and audits related to planning and scheduling.
- Assist in the evaluation of claims analysis, time impact analysis (TIA), and delay justifications as required.
- Ensure full compliance with company scheduling procedures, management requirements, and contractual obligations.
- Integrate data from project control tools (*, Microsoft Project, Primavera P6, ERP, SAP, Oracle, EDMS) into progress and executive dashboards.
Required Qualifications and Experience
- 5-10 years of experience in project scheduling, preferably within EPC projects.
- Proficiency in advanced scheduling tools.
- Demonstrated ability to develop, monitor, and control complex project schedules.
- Experience with earned value management (EVM) analysis.
- Familiarity with project control tools such as Microsoft Project, Primavera P6, ERP, SAP, Oracle, and EDMS.
Work Environment
The Project Scheduler will work collaboratively with engineering, procurement, and construction teams, as well as external contractors. This role requires proactive project management and coordination to ensure timely project delivery.
Application Process
Interested candidates are invited to apply for this full-time position. Salary details will be discussed during the interview process.
متطلبات الوظيفة
- تتطلب ٢-٥ سنوات خبرة
وظائف مشابهة
قد يعجبك أيضاً
- وظائف ذات صلة بـ Project Scheduler
- وظائف طبيب أسنان عام في الليث
- وظائف مهندس مدني في الليث
- وظائف مهندس زراعي في الليث
- وظائف فني كهربائي تمديدات كهربائية في الليث
- وظائف مهندس كهربائي في الليث
- مجالات وظيفية أخرى في الجبيل
- وظائف Electrical Supervisor في الجبيل
- وظائف System Administrator في الجبيل
- وظائف Project Engineer في الجبيل
- وظائف مهندس مدني في الجبيل
- وظائف أخصائي مبيعات في الجبيل
- وظائف مساعد إداري في الجبيل
- وظائف بائع في الجبيل
- وظائف مهندس سلامة وصحة مهنية في الجبيل
- وظائف فني كهربائي تمديدات كهربائية في الجبيل
- وظائف أخصائي صحة وسلامة مهنية في الجبيل
- استكشف الوظائف في أنحاء المملكة
- وظائف أخصائي تقنية إشعاعية في الرياض
- وظائف Sales Supervisor في ابها
- وظائف أخصائي مبيعات في شقراء
- وظائف Regional Sales Manager في الرياض
- وظائف Data Analyst في الخرج
- وظائف مساعد إداري في مكة المكرمة
- وظائف Planning & Scheduling Engineer في الجبيل
- وظائف منسق منتجات في بقيق
- وظائف مهندس مدني في ابها
- وظائف Sales Supervisor في القصيم