Solution Architect & Project Manager Oracle Primavera Unifier
📣 إعلان| نوع العقد | دوام كامل | |
| طبيعة الوظيفة | بالموقع | |
| الموقع | الرياض |
وصف الوظيفة
About the Role
NextEra is seeking an experienced Solution Architect & Project Manager Oracle Primavera Unifier to lead end-to-end Project Management Information System (PMIS) implementation programs. This full-time position is based in Riyadh, Saudi Arabia, and focuses on driving successful project delivery for enterprise clients.
Key Responsibilities
- Lead Oracle Primavera Unifier implementations from initiation through post-go-live support.
- Act as both Solution Architect and Project Manager, overseeing solution design, delivery governance, stakeholder management, and execution.
- Conduct business requirement workshops and define implementation roadmaps.
- Design and review Business Processes (BPs), workflows, forms, data elements, shell structures, dashboards, reports, and print templates.
- Manage project planning, resource allocation, budgeting, scheduling, RAID logs, and executive reporting.
- Oversee configuration, testing, deployment, User Acceptance Testing (UAT), go-live, and hypercare activities.
- Lead integration and data migration initiatives involving Oracle Fusion ERP, Oracle EBS, SAP, Primavera P6, Aconex, and other third-party systems.
- Manage onsite and offshore teams, ensuring quality delivery within scope, schedule, and budget.
- Build client relationships and engage with senior stakeholders and leadership teams.
Candidate Profile
The ideal candidate will be a professional at the Senior Manager, Associate Director, or Solution Architect level, with over 10 years of experience in relevant fields. This role requires a strong combination of functional consulting, solution architecture, and project leadership expertise.
Required Experience and Capabilities
- Capability to independently lead Oracle Unifier implementation programs valued at USD 1M+.
- Experience in managing CXO-level stakeholders and global delivery teams.
Preferred Industry Experience
Candidates with experience in the following sectors are preferred:
- Construction
- Infrastructure
- Utilities
- Energy
- Transportation
- Smart Cities
- EPC (Engineering, Procurement, and Construction)
Location
This position is based in Riyadh, Saudi Arabia.
متطلبات الوظيفة
- تتطلب ٥-١٠ سنوات خبرة
وظائف مشابهة
قد يعجبك أيضاً
- وظائف ذات صلة بـ Solution Architect & Project Manager Oracle Primavera Unifier
- وظائف Graphic Designer في الظهران
- وظائف متخصص علاقات عامة في الظهران
- وظائف مهندس مدني في الظهران
- وظائف مهندس معماري في الظهران
- وظائف سائق شاحنة صغيرة في الظهران
- مجالات وظيفية أخرى في الرياض
- وظائف Graphic Designer في الرياض
- وظائف مندوب مبيعات في الرياض
- وظائف محامي في الرياض
- وظائف مدير الأغذية والمشروبات في الرياض
- وظائف أخصائي تسويق في الرياض
- وظائف مدخل بيانات في الرياض
- وظائف أخصائي عمليات موارد بشرية في الرياض
- وظائف أخصائي أمن سيبراني في الرياض
- وظائف مهندس مدني في الرياض
- وظائف مراقب خدمات عامة في الرياض
- استكشف الوظائف في أنحاء المملكة
- وظائف معلم صعوبات التعلم في حبونا
- وظائف مدير ضيافة في الرياض
- وظائف طبيب أسنان أطفال في الخبر
- وظائف Medical Representative في جدة
- وظائف Supervisor في الرياض
- وظائف أخصائي علاج طبيعي في محايل
- وظائف Process Safety Engineer في راس تنورة
- وظائف فني كهربائي تمديدات كهربائية في ينبع
- وظائف Massage Therapist في الهفوف
- وظائف مدرب معتمد في ينبع
