HSE Officer Data Center Construction
📣 إعلان| نوع العقد | دوام كامل | |
| طبيعة الوظيفة | بالموقع | |
| الموقع | الرياض |
وصف الوظيفة
About the Role
Double Marks is seeking an experienced HSE Officer to join their team in Riyadh. This full-time, site-based role is critical for a major data center construction project, focusing on the safe execution of civil, structural, and subsequent fit-out activities from mobilization through project completion. The position requires a hands-on approach to ensuring compliance with health, safety, and environmental standards.
Key Responsibilities
- Conduct daily site HSE inspections to ensure adherence to project HSE requirements.
- Lead toolbox talks, safety inductions, and workforce training sessions.
- Implement and monitor Permit to Work (PTW), Risk Assessment Method Statements (RAMS), Job Safety Analysis/Job Hazard Analysis (JSA/JHA), and site safety procedures.
- Oversee activities including excavation, rebar, formwork, concrete works, scaffolding, lifting operations, work at height, and heavy equipment.
- Identify unsafe conditions or acts and ensure timely corrective actions are implemented.
- Participate in incident and near-miss investigations and prepare detailed reports.
- Maintain comprehensive HSE records, inspection reports, checklists, and provide weekly/monthly reporting.
- Coordinate effectively with construction teams, subcontractors, and the Main Contractor's HSE team.
- Support emergency preparedness and overall site HSE compliance across all construction phases.
Qualifications and Experience
- Minimum of 5 years of construction HSE experience, with a preference for experience in Saudi Arabia or the GCC region.
- Strong experience in civil and structural construction activities is required.
- Good knowledge of Saudi HSE requirements and general construction safety practices.
- Solid understanding of PTW, RAMS/JSA, lifting operations, excavation safety, work-at-height procedures, and temporary works safety.
- Proficiency in English communication and reporting skills.
- Experience with data center or mission-critical projects is considered an advantage.
- Candidates currently based in Saudi Arabia with a transferable Iqama are preferred.
- Preference will be given to candidates who can join immediately or on short notice.
Work Environment
This role is based on-site in Riyadh, focusing on a large-scale data center construction project. The HSE Officer will work closely with various construction teams, subcontractors, and the Main Contractor's HSE personnel to maintain a safe working environment throughout all project phases.
متطلبات الوظيفة
- لا تتطلب خبرة
وظائف مشابهة
قد يعجبك أيضاً
- وظائف ذات صلة بـ HSE Officer Data Center Construction
- وظائف محضر قهوة (باريستا) في تبوك
- وظائف مندوب مبيعات في تبوك
- وظائف مصمم جرافيك في تبوك
- وظائف موظف استقبال فندق في تبوك
- وظائف مساعد إداري في تبوك
- مجالات وظيفية أخرى في الرياض
- وظائف محضر قهوة (باريستا) في الرياض
- وظائف مدير مبيعات في الرياض
- وظائف تنفيذي تسويق في الرياض
- وظائف مندوب مبيعات في الرياض
- وظائف مصمم جرافيك في الرياض
- وظائف أخصائي تسويق في الرياض
- وظائف بائع في الرياض
- وظائف موظف استقبال فندق في الرياض
- وظائف مدير مشتريات في الرياض
- وظائف مساعد إداري في الرياض
- استكشف الوظائف في أنحاء المملكة
- وظائف أخصائي تسويق إلكتروني في الرياض
- وظائف سائق شاحنة صغيرة في مكة المكرمة
- وظائف Chef في الرياض
- وظائف أخصائي عمليات موارد بشرية في حفر الباطن
- وظائف مصفف أرفف في الرياض
- وظائف أخصائي علاج نفسي في بيشة
- وظائف Business Development Manager في الظهران
- وظائف Production Engineer في الدمام
- وظائف مرافق (مشرف) حافلة في محايل
- وظائف أخصائي بصريات في عرعر
