Contract TypeFull-time
Workplace typeRemote
LocationRiyadh

Job Description

About the Role

Ambitek UAE is seeking a Data Centre Construction Manager to supervise a large, mission-critical data centre build in Riyadh, Saudi Arabia. This full-time position involves working for an international engineering consultancy, overseeing the construction process from mobilisation through to handover.

Role Context

The successful candidate will be the on-site expert, responsible for tracking the power train against the programme, monitoring equipment delivery, and assessing contractor readiness for integrated systems testing. This role focuses on ensuring facility functionality and timely commissioning, moving beyond the commercial targets often associated with contractor-side roles.

Key Responsibilities

  • Lead site supervision across civil, structural, architectural, MEP, ICT, and ELV works.
  • Oversee the project from mobilisation through Level 1 to Level 5 commissioning and handover to operations.
  • Review method statements, submittals, and shop drawings.
  • Track long-lead equipment to ensure timely delivery.
  • Provide constructability and value engineering input.
  • Mentor site engineers and supervisors.

Qualifications and Experience

  • An engineering degree in mechanical, electrical, or civil.
  • A minimum of 15 years of experience in construction management, with a focus on data centre or mission-critical delivery.
  • Hands-on testing and commissioning experience is required.
  • Experience working on remote sites.
  • Saudi Council of Engineers accreditation is necessary before mobilisation. Assistance will be provided to secure this if not already held.

Work Location

This role is based in Riyadh, Saudi Arabia, focusing on a central, mission-critical data centre project.

Application Process

Candidates meeting the specified requirements are encouraged to apply for this full-time position. Salary details will be discussed during the interview process.


Requirements

  • Requires 5-10 Years experience

Similar Jobs