img
Contract TypeFull-time
Workplace typeOn-site
LocationRiyadh

Job Description

About the Role

Albawani is seeking a Methods Engineering Manager Project to join their team in Riyadh, Saudi Arabia. This full-time role is responsible for developing, governing, and implementing construction methodologies for projects, ensuring that all work is executed safely, efficiently, and in alignment with project design, program, and site constraints. The Methods Engineering Manager reports to the Technical Director and provides leadership in construction methodology, serving as a technical link between design, engineering, planning, and site execution.

Key Responsibilities

  • Develop and oversee construction methodologies and sequencing strategies, including the design and coordination of temporary and enabling works for both underground and above-ground structures.
  • Formulate cost-effective construction approaches and detailed lifting plans for heavy lifts, demonstrating expertise in modular and off-site construction techniques.
  • Identify repetitive construction processes and implement optimized methodologies to enhance productivity and achieve project efficiencies.
  • Liaise with and support project teams in adopting Modern Methods of Construction (MMC) across multiple project sites.
  • Demonstrate strong knowledge of geotechnical parameters and their impact on temporary works design.
  • Propose and coordinate deep excavation solutions, including slope stability assessments and shoring systems.
  • Define access arrangements, logistics planning, lifting strategies, temporary works concepts, and construction staging.
  • Lead constructability and buildability reviews in collaboration with Design Managers, construction teams, and subcontractors.
  • Provide expert construction methodology input for value engineering initiatives and risk mitigation strategies.
  • Act as the technical interface between Design, Engineering, BIM, and site execution teams.
  • Review design deliverables for constructability and provide Temporary Works Bill of Quantities for planning and budgeting.
  • Ensure all construction methodologies comply with HSE requirements, statutory regulations, and company procedures.
  • Lead and support risk assessments, lifting studies, and temporary works risk evaluations.
  • Embed safety-by-design and safety-by-methodology principles into construction planning.
  • Support planning teams in developing practical construction sequences, accurate activity durations, and resource loading.
  • Monitor site execution to ensure alignment with approved methodologies and recommend corrective actions.
  • Lead, mentor, and develop the Methods Engineering team, Temporary Works Coordinator, and Technical Coordinators.
  • Implement consistent engineering and design management practices and foster a culture of constructability and risk awareness.
  • Capture lessons learned and drive continuous improvement in design delivery and coordination processes.

Qualifications and Experience

  • Over 10 years of experience in design and build construction projects with complex site execution, logistics, and temporary works requirements.
  • Demonstrated expertise in construction methodology leadership and execution planning.
  • Strong knowledge of applicable civil engineering codes, standards, and regulatory requirements.
  • Proven ability to translate design intent into safe, practical, and efficient construction methodologies.
  • Solid understanding of temporary works design, construction sequencing, and constructability risk management.
  • Experience in leading methodology reviews, technical briefings, and effective site implementation.

Work Contacts

This role involves extensive collaboration with internal teams including the Technical Director, Senior Design Manager, Design Managers (all disciplines), Construction/Operations Team, Planning/Project Controls Team, BIM/Digital Engineering Team, QA/QC Team, HSE Team, and Temporary Works Coordinator. External contacts include Client/PMC Representatives, Lead Design Consultant, Specialist Subcontractors, Temporary Works Designers, Lifting Specialists and Method Consultants, and Authorities Having Jurisdiction.

Working Conditions

The working environment for this position will be split between the site and site office. The role involves a low to medium degree of physical risk.


Requirements

  • Requires 5-10 Years experience

Similar Jobs